How it works, service by service
Pick the service your strata is considering. Each follows its own path — what happens at every step, what your council receives along the way, and the short list your council handles beside it.
The Electrical Planning Report, start to finish
From intake to final delivery, the main variable is BC Hydro consumption-data turnaround. We commit to a delivery date in the proposal and keep you updated through to delivery.
- 01
Intake
Send your building details — units, address, any documents you have.
You receive: A fixed-price proposal, the same business day.
- 02
Onboarding documents
Your council gathers what the strata has on file — strata plan, electrical drawings, past reports and studies — and signs the BC Hydro data authorization. The utility data request itself is on us.
- 03
Property assessment
A physical inspection of every electrical room, switchgear, transformer, and panel — the in-person inspection the regulation requires.
- 04
Analysis
Load calculations to electrical-code standards on twelve months of metered consumption data — real demand, not code-based estimates — plus future-electrification scenarios: EV charging, heat pumps, gas-to-electric.
- 05
Report preparation
Findings translated into a plain-language report written for council — covering every content area BC strata law requires, with upgrade recommendations ranked by the capacity each would unlock.
- 06
Review window
Council reviews the draft, asks questions, and submits feedback before anything is finalized. Nothing is delivered sight-unseen.
You receive: The complete draft — before it is finalized.
- 07
Final delivery
A plain-language council presentation is available whenever your council wants one. Pairing this EPR with an EV Ready Plan also includes a Living Report — an interactive web version every owner can open alongside the PDF — at no extra charge; ordering the EPR on its own, the Living Report is available as an add-on.
You receive: The final EPR — with a council presentation on request, and a Living Report included if paired with an EV Ready Plan.
- 08
Follow-up support
Questions tend to come up after delivery, at the next council meeting or when a contractor quotes the work, and we are glad to answer them as they arise. We get back to you quickly, usually the same business day.
You receive: Plain answers to your council’s questions after delivery.
The EV Ready Plan, start to finish
A BC Hydro program deliverable rather than a Strata Property Act report — and the route to the plan rebate (up to 75% of the plan's cost, to a $3,000 maximum). Most stratas combine it with an EPR, since the two share data inputs.
- 01
Intake
Send your building, unit, and parking details. Fixed price, known before council commits.
You receive: A fixed-price proposal, the same business day.
- 02
Onboarding documents
Your council gathers what the strata has on file — strata plan, electrical drawings, parking layout, past reports and studies — and signs the utility data authorization. The data request itself is on us.
- 03
Site & parking assessment
Conduit routing and parking-stall layout reviewed on site against the building’s structural and electrical constraints.
- 04
Charging strategy
A 100% EV-Ready strategy — every residential stall provisioned, not just the most accessible ones — with a charging-management evaluation against existing service capacity. Energy management done well can defer or avoid a costly service upgrade.
- 05
Phased implementation plan
How the strata grows charging capacity over time, at a pace owners can vote for.
You receive: A fundable, phased roadmap with itemized cost estimates.
- 06
Pre-approval & rebate application
The plan rebate covers up to 75% of the plan’s cost, to a $3,000 maximum — and the plan on file is what makes the strata eligible to pursue BC Hydro’s later installation rebates.
You receive: Help with the BC Hydro pre-approval application and the rebate application.
- 07
Council presentation
Available whenever your council wants it — the plan walked through in plain language, ready for adoption.
- 08
Follow-up support
Questions come up after the plan is adopted, when owners ask about charging or a contractor quotes the installation, and we are glad to answer them as they arise. We get back to you quickly, usually the same business day.
A managed electrification project, start to finish
Every engagement is scoped and priced per project — an EV charging rollout, a heat pump conversion, a service upgrade. A typical engagement takes this shape, with your council keeping every decision and one point of contact managing the project from planning through completion.
- 01
Tell us about the project
Where your strata is at — report in hand, quotes gathered, or just starting. The engagement is scoped and priced per project, so council knows the cost before it commits.
You receive: A per-project proposal, with a reply the same business day.
- 02
Scope & specifications
The report's recommendations turned into a written scope of work — the document that makes every quote comparable.
You receive: A written scope contractors can price like-for-like.
- 03
Procurement
We prepare the request for quotes, field contractor questions, and help council compare bids on substance — scope coverage, exclusions, schedule — not just the bottom line.
- 04
Council decides
Your council selects the contractor, with the bids laid side by side on scope, exclusions, and schedule so the choice is an informed one.
- 05
Rebates & approvals
BC Hydro rebate streams, utility coordination, and permitting paperwork kept moving on the timelines the programs require.
- 06
Delivery oversight
Milestones tracked against schedule and budget; progress and invoices reviewed against the agreed scope; issues flagged while they are still small.
- 07
Closeout & communication
Council updates and owner-meeting material in plain language throughout — written for the people who have to vote on the project.
You receive: Closeout documentation, and an owner-ready paper trail for the whole project.
Pricing
One proposal, one price — before you commit
Fixed-price by proposal. Send us your building details and we respond the same business day with a fixed-price proposal, quoted before you commit.
Project management engagements are scoped and priced per project — also by proposal, so your council knows the cost before it commits.
Strata managers juggle a lot. We take electrical planning off your list entirely.
The council walkthrough
We present the findings to council in plain language
Available in every engagement — just ask. We answer questions and walk through the funding plan or implementation phases — so council can act on the report, not just file it.
Process FAQs
How long does the process take?
What do we (the strata) need to provide?
Can we see a sample report before we commit?
Does the process cover managed electrification projects too?
Request a proposal
Get your fixed-price proposal
Sent the same business day. For strata council members and property managers.
Seven details is all it takes
- ✓ Your name and email
- ✓ Your role on the strata (council or manager)
- ✓ The service you are interested in
- ✓ Strata plan number
- ✓ Property address and postal code
Have the strata plan, unit count or drawings handy? Add the unit count with the request and the rest after you send it — optional, never required.
Your information is used only to prepare your proposal — no spam, no resale.
Prefer to talk first? Call 778-910-4772 or email info@cfelectrical.ca.
Thanks, there. Your proposal is on its way today.
Want it even more precise? Anything below helps; nothing is required.