An EV Ready Plan unlocks the BC Hydro plan rebate — up to 75% of the plan's cost, to a $3,000 maximum — and is the prerequisite for the program's infrastructure rebates, which fund the infrastructure work that follows the plan. After July 15, 2026, an EVRP, Electrical Planning Report, or Opportunity Assessment Report becomes mandatory to access standalone EV charger rebates. CF Electrical Services prepares EVRPs for Comox stratas and helps with the rebate package.

EV Ready Plan deadline July 15, 2026
Utility BC Hydro

Get a fixed-price proposal — Comox

Sent the same business day. For strata council members and property managers.

Your details are never shared. We reply the same business day.

Why now

Why Comox stratas need this report now

An EV Ready Plan is voluntary in British Columbia, but it's the most direct route to BC Hydro rebate dollars and the cleanest way to get a Comox strata's parking infrastructure ready for the next decade (program details on BC Hydro's apartment & condo charger-rebate page). The plan covers 100% EV-ready conduit and capacity, charging-management evaluation, phased implementation cost estimates, and help with the rebate application.

As of July 15, 2026, an EVRP, an Electrical Planning Report, or an Opportunity Assessment Report is mandatory to access standalone EV charger rebates from BC Hydro. Comox councils that want the plan rebate — and eligibility for the later installation rebates — need a plan in place, and a planning provider that knows how to navigate BC Hydro EV charging program documentation.

What you receive

What CF Electrical Services delivers in Comox

Comox stratas commissioning an EVRP receive a 100% EV-ready strategy with parking and conduit layout, an charging-management evaluation against existing service capacity, a phased implementation roadmap with itemized cost estimates, and help with the BC Hydro rebate application. The plan is built to answer the questions BC Hydro asks before approving rebates.

CF Electrical Services prepares every EVRP in line with BC Hydro EV charging program qualified-professional requirements. Comox councils that combine an EVRP with an Electrical Planning Report receive a single deliverable that also satisfies the BC strata law EPR mandate.

Local building stock

About strata buildings in Comox

Strata building interior of the kind common across Comox

Townhouse and low-rise wood-frame condo developments concentrated along Comox Avenue and through the Crown Isle area.

What that means for electrical capacity planning in Comox: 1980s wood-frame walk-ups carry their own pattern: aluminum branch wiring in some buildings, undersized panel boards almost universally, and original 100A or 200A services that don't leave room for meaningful EV adoption without an upgrade. Townhouse complexes pose a different challenge — individual unit metering, shared outdoor parking, and questions about whether upgrades happen at the unit panel, the cluster transformer, or the BC Hydro service.

How we deliver

Our process for Comox stratas — eight steps, every one of them on us.

  1. 01

    Intake

    Send us eight details — your name, email, phone number, role on the strata, the service you are interested in, strata plan number, postal code and address. We respond the same business day with a fixed-price proposal.

  2. 02

    Onboarding documents

    Your council gathers what the strata has on file — strata plan, electrical drawings, past reports and studies — and signs the BC Hydro data authorization. The utility data request itself is on us.

  3. 03

    Property assessment

    A physical inspection of every electrical room, switchgear, transformer, and panel. Desktop-only reviews miss the constraints that matter.

  4. 04

    Analysis

    Report-specific work — load calculations under electrical-code standards, future-electrification scenarios, asset inventories, and funding models — built on twelve months of metered BC Hydro data, not code-based estimates.

  5. 05

    Report preparation

    Findings translated into plain-language deliverables — all the technical data and calculations, plus a narrative written for council.

  6. 06

    Review window

    Council receives the draft report with the opportunity to ask questions and submit feedback before the report is finalized.

  7. 07

    Final delivery

    The final report delivered to council — with a plain-language council presentation available on request. Engaging CF for both an EPR and an EV Ready Plan also includes a Living Report at no extra charge (an interactive web version every owner can open alongside the PDF); ordering a single report, it's available as an add-on.

  8. 08

    Follow-up support

    Questions tend to come up after delivery, at the next council meeting or when a contractor quotes the work, and we are glad to answer them as they arise. We get back to you quickly, usually the same business day.

EV Ready Plan FAQs for Comox stratas

Is an EV Ready Plan mandatory for Comox stratas?

Not currently — but starting July 15, 2026, an EVRP, Electrical Planning Report, or Opportunity Assessment Report becomes mandatory to access BC Hydro standalone EV charger rebates. Most Comox stratas pursuing rebates are commissioning an EVRP regardless.

Who prepares an EV Ready Plan?

CF Electrical Services prepares every Comox EV Ready Plan in line with BC Hydro EV charging program requirements, and helps with the rebate package.

Can we see a sample EV Ready Plan before we commit?

Yes. We will show your council a redacted sample from a comparable building and connect you with references from comparable stratas — before you commit to anything. It is a request worth making of every provider you shortlist.

How long does an EV Ready Plan take from start to finish?

For Comox stratas, the main variable from intake to final delivery is BC Hydro consumption data turnaround, which we can't fully control. We commit to a delivery date in the proposal and keep you updated through to delivery.

How do I get a quote?

Send us your building details — name, address, unit count, and any documents you already have — through the form below or by emailing info@cfelectrical.ca. We respond the same business day with a fixed-price proposal.

On your council's side of the table

Technical planning your council can act on

CF Electrical Services delivers the report your Comox strata needs and walks your council through it — plain-language findings and a clear path from planning to a finished project.

Request a proposal

Get your fixed-price EV Ready Plan proposal — Comox

Sent the same business day. For strata council members and property managers.

Eight details is all it takes

  • Your name, email and phone number
  • Your role on the strata (council or manager)
  • The service you are interested in
  • Strata plan number
  • Property address and postal code

Have the strata plan, unit count or drawings handy? Add the unit count with the request and the rest after you send it — optional, never required.

Your information is used only to prepare your proposal — no spam, no resale.

Prefer to talk first? Call 778-910-4772 or email info@cfelectrical.ca.

Your details are never shared. We reply the same business day.