Skip to content

CF Electrical Services Tool

Compare EPR Proposals — BC Strata Compliance Checklist

Strata corporations of five or more lots in BC must obtain an Electrical Planning Report by December 31, 2026 (Metro Van / FVRD / CRD) or December 31, 2028 (rest of BC). Not all proposals cover the same scope. Use this 16-item checklist to compare what's actually included.

CF Electrical Services
16 / 16
100% compliant
Proposal B
0 / 16
0% compliant
Proposal C
0 / 16
0% compliant
Email Me This Comparison
Compliance Item CF Electrical Services Proposal B Proposal C
PROFESSIONAL QUALIFICATIONS & ACCOUNTABILITY
Report Sealed by the Credential the Regulation Calls For
Under BC strata law, an Electrical Planning Report for a Part 3 (complex) building must be sealed by a Professional Engineer (P.Eng) or by a Certified Technician. An EPR for a Part 9 (simple) building can also be sealed by a Master Electrician. CF Electrical Services seals every Part 3 EPR with our partner P.Eng and every Part 9 EPR with our Master Electrician — the credential the regulation requires for the building.
BC strata lawStrata Property Act
STRATA PROPERTY ACT — EPR MANDATORY CONTENT (BC strata law)
On-Site Inspection of All Electrical & Mechanical Infrastructure
Physical inspection of electrical rooms, switchgear, transformers, and panels. Desktop-only reviews miss critical constraints and aging equipment.
BC strata lawBC Hydro EPR Guide
Electrical Drawings & Strata Plan Pulled from the Municipality
Original electrical drawings and strata plans retrieved directly from the municipality on the strata's behalf, ensuring calculations are based on the legal as-built configuration rather than guesswork.
Due Diligence
BC Hydro 12-Month Consumption Data Analysis
Actual demand data determines true peak demand and spare capacity, rather than code-based estimates alone, which often overstate available capacity.
BC strata lawelectrical code
Peak Demand, Spare Capacity & Load Diversity Calculations
Accurate analysis per electrical-code standards with load diversity factors determines how much capacity is truly available before triggering expensive utility upgrades.
BC strata lawelectrical code
Future Electrification Scenarios (EV + Heat Pumps + DHW)
The Strata Property Act requires modelled estimates of capacity for future demands. A compliant report must cover multiple scenarios — not just EV charging alone.
BC strata law
Gas-to-Electric Conversion Estimates
Estimated electrical capacity required to convert systems currently powered by gas or other non-electric sources to electric alternatives.
BC strata law
Demand Management & Load Reduction Recommendations
Mandated strategies (LED upgrades, load scheduling, energy management) can free up significant capacity and defer or eliminate the need for costly service upgrades.
BC strata law
Upgrade Recommendations with Estimated Capacity Freed
Specific upgrades or modifications to increase capacity, with the exact amount of electrical capacity each action would free up identified.
BC strata law
BC HYDRO EV READY PLAN & REBATE ELIGIBILITY
EV Ready Plan Bundled with the EPR
Combining the EVRP with the EPR keeps the engagement faster and more cost-effective. After July 15, 2026, an EVRP, an EPR, or an Opportunity Assessment Report becomes mandatory to access standalone EV charger rebates.
BC Hydro Program
100% EV Ready Strategy & Parking/Conduit Layout
Detailed plan to install EV charging capability in every residential parking stall, including specific conduit routing reviews for charger installation.
BC Hydro EV Ready Req.
energy management Evaluation & Charging Performance Assessment
Evaluates energy-management systems to optimize charging within existing capacity, plus charging performance per vehicle based on climate and demographics.
BC Hydro EV Ready Req.
Phased Implementation Plan with Itemized Cost Estimates
BC Hydro requires a recommended solution with cost estimates for budgeting. A phased plan gives the strata a clear, fundable roadmap.
BC Hydro EV Ready Req.
BC Hydro Rebate Application Prepared & Submitted on Your Behalf
All documentation and submission for the EV Ready Plan rebate (up to $3,000) and the EV charging infrastructure rebate (up to $120,000) handled by the consultant — so the strata captures every dollar available.
BC Hydro Rebate Program
ADDITIONAL VALUE — THE CF ELECTRICAL DIFFERENCE
Utility Service Upgrade Feasibility & Cost Assessment
If the building needs more capacity, feasibility and cost of a BC Hydro service upgrade is assessed — a critical step many providers skip, leaving stratas with unexpected six-figure costs.
Strata Council Board Presentation
Findings presented directly to council and owners in plain language, building consensus for investment decisions and answering technical questions in the room.

References: BC strata law (Strata Property Act) · BC Hydro EV charging program · Canadian electrical-code standards.

Don't settle for a report that just checks a box.

Every CF Electrical Services Electrical Planning Report covers all 16 items on this checklist. Sealed by our partner P.Eng registered with Engineers and Geoscientists BC. Compliant with the Strata Property Act and BC strata law. Fixed-price proposals — no scope creep, no surprises.

Request a Fixed-Price Proposal

Request a Fixed-Price Proposal — Compare Proposals Tool

Send us your building details. We respond within one business day with a fixed-price proposal.

We'll get back to you within one business day. No spam, no follow-ups you didn't ask for.